A few projects
On these projects I handled sales, scoping and project management; the engineering is the team’s.
Industrial quotes prepared without re-keying
- The problem
- Preparing a quote meant reading very different technical drawings, then re-keying dimensions, loads, tolerances and materials into the calculator.
- What we did
- An application that reads the drawings with a vision model and feeds the calculator directly; each material written as free text is matched against a catalogue of 288 grades; the data stays in the European Union.
- What came of it
- Extraction accuracy measured field by field: 85 to 96% depending on the documents.
- What I take from it
- Measured with our evaluation tool: Gemini’s “Flash” model does better than the most powerful one, for far less. The biggest model is not always the right one.
Four agents to respond to calls for tender
- The problem
- Responding to a call for tender takes days, and inconsistent data can get the bid rejected.
- What we did
- Map the process with the team, build four lightweight agents in Copilot, the tool they already use, test them, then share them with the team.
- Results so far
- Roughly one working day saved per tender, and more consistent data. This is an estimate from the testing phase, not yet a measurement in production.
- What I take from it
- Build the agents with the people on the ground from day one, to encourage adoption: bottom-up innovation.
Also: reports supporting research tax credit claims (France’s Crédit d’Impôt Recherche), drafted from a client’s own documents (Vermon).